Dear Colleagues:
The next MW collaboration meeting will be held from 9-4:30 on
Friday, April 30 in WH10NW at FNAL.
Video and audio will be available via the ESNET IP Ad-hoc bridge
(the same system used for the last meeting).
Video: dial 826763 at 384 kbs
Voice only: 1-510-883-7860; at the prompt enter 826763 followed by # sign.
A draft agenda for the meeting is given below. Please send us a message if
you would like to make a presentation. We will send out a final agenda on
Thursday. Thanks.
Ed and Mike
Working Group Reports
1) Background Group (Tim)
2) Calibration Group (Josh)
3) Detector Mech. Design Group (Dave)
4) Site and Civil Const. Group (Jon)
5) Electronics Group (Jim)
6) Other Physics Group (Janet)
Discussion of Key Questions
1) Number and size of detector regions
2) Number and size of baseline detectors
3) 0.5 to 1% relative calibration goal: moveable detectors, calibration
systems, detector designs
4) Scintillator choice - Gd, scint type
Discussion of R&D Proposal
1) Outline of document
2) What should we ask for?
3) Timescale and milestones
Discussion of Interactions with Others
1) APS study
2) West Coast/Diablo Canyon/Daya Bay
Received on Mon Apr 26 15:33:38 2004
This archive was generated by hypermail 2.1.8 : Fri Apr 30 2004 - 03:28:09 CDT