Agenda for October 27-28, 2005 Meeting



Thursday, October 27, WH1N

11:00 Intro and collaboration issues                          Mike and Ed       15

11:15 Update on UK plans                                      Steve B.          15

Simulation:

11:30   Simulation strategy, Geant4, FastSim    		Matt          20'

12:00-1:00 Lunch

1:00  RAT- Logic, design, and overview  			Stan          20'

1:20  RAT- How to use it                         		Stan          20'

1:40  Reconstruction studies                     		Chris         20'

2:00   KSU studies                                  		Tim           20'

2:20  Positron response with RAT                 		Zelimir       20'

2:50-3:15 Break

3:15  Veto system design and R&D                                Steve D.      45'

4:00  Neutron flux calculations and Li-9 production rates       Jon          45'


Friday, October 28, WH1N

Starts at 9:00

Braidwood site updates                                       Jon      10

Civil design updates                                         

Scinitillator updates                                        Dick     15

Prototype plans                                              Ed       10

Next steps: discussion






Video and audio: We will use the ESNET IP Ad-hoc bridge as we did for the last meeting.

  Video:  dial 826763 at 384 kbs
  Voice only: 1-510-883-7860; at the prompt enter 826763 follwed by # sign.