Thursday, October 27, WH1N 11:00 Intro and collaboration issues Mike and Ed 15 11:15 Update on UK plans Steve B. 15 Simulation: 11:30 Simulation strategy, Geant4, FastSim Matt 20' 12:00-1:00 Lunch 1:00 RAT- Logic, design, and overview Stan 20' 1:20 RAT- How to use it Stan 20' 1:40 Reconstruction studies Chris 20' 2:00 KSU studies Tim 20' 2:20 Positron response with RAT Zelimir 20' 2:50-3:15 Break 3:15 Veto system design and R&D Steve D. 45' 4:00 Neutron flux calculations and Li-9 production rates Jon 45' Friday, October 28, WH1N Starts at 9:00 Braidwood site updates Jon 10 Civil design updates Scinitillator updates Dick 15 Prototype plans Ed 10 Next steps: discussion
Video and audio: We will use the ESNET IP Ad-hoc bridge as we did for the last meeting.
Video: dial 826763 at 384 kbs Voice only: 1-510-883-7860; at the prompt enter 826763 follwed by # sign.